language:中文   |  English   |   Русский язык   |   Reino de España    |   República Portuguesa  مملكة عربية سعودية

Your present location:首页 >> Case >> Wind Power >> Zhumadian Wind Farm, He'nan

Zhumadian Wind Farm, He'nan

Number of visits: Date:2017.05.12
 

Project name: Zhumadian Wind Farm, He'nan

Model of system: ALP702W

Installed on: Pitch bearings

Details of installation: This project is designed with a installed capacity of 50,000 kW and equipped with twenty-five2.0MW double-feed wind turbine, of which pitch bearing passive waste grease collecting container fails to collect any waste grease, causing waste grease leakage from the sealing ring and splashed onto the aerofoil under action of rotating wheel hub,, leading to worse influence on the operating efficiency of the maintainers and resulting in hidden trouble to equipment safe production. After the positive waste grease collecting system is installed, the waste and used grease is centrally collected. As a result, the lubrication environment of wind turbine is significantly improved.

1111

TypeInfo: Wind Power

Keywords for the information:

Sales:+86-371-8625-8298
Service:+86-800-883-6862

 
Message:
* Entered characters:0 Word
Less than or equal500Character
Your name:
 
小于等于20个字符(包括A-Z、a-z、0-9、汉字、不含特殊字符)
Email:
 
Verification code:
   

Copyright © Autol Technology     豫ICP备14009735号-1      Powered by www.300.cn